How do I add a header row for dates to a checklist? (2025.02)
Issue
I want to add another row to the top of the checklist so I can write in dates to track when a task is finished. If I just print the checklist, there isn't enough space to write in a date.
I want to do something like this...
Solution
To add a row for dates,
1. Open Connect System Management > Organization > Checklists.
2. Click to select a checklist.
3. Click to select Include a header row for dates.
Issue I want to add another row to the top of the checklist so I can write in dates to track when a task is finished. If I just print the checklist, there isn't enough space to write in a date. I want to do something like this... Solution To add a ...
Update an applicant's qualifications with a completed date, expiration date, renewed date, and required by date. You can leave the date fields blank if a date is not required or available. Adding important dates 1. Open Connect Human Resources > ...
This section is for those of you who have completed the year-end steps checklist before or for those of you who want a really short summary of the steps that you're about to complete. If you open the PDF on your computer, you'll find a short ...
Add notes to a step to provide an explanation or additional instruction to complete a step in a steps checklist. In the 2024.08 release, the notes for each step has been moved to a separate tab. The notes field allows an unlimited number of ...
Add notes to a step to provide an explanation or additional instruction to complete a step in a steps checklist. In the 2024.08 release, the notes for each step has been moved to a separate tab. The notes field allows an unlimited number of ...