Why_is_the_Overheads_link_not_working_

Why is the Overheads link not working?

Turn on the interface to Project Accounting, Asset Management, and Materials Management in the applications for Project Accounting, Asset Management, Materials Management, Payroll, and Timekeeping.

 

Set up Project Accounting

1. Open Connect Project Accounting > Organization.

2. Click to select Organization.

3. Click to select the Interfaces tab.

4. Click to select the Asset Management subtab and then use the Interface menu to select Caselle 4.x.

5. Click to select the Materials Management subtab and then use the Interface menu to select Caselle 4.x.

6. Click Save (CTRL+S).

Project Accounting is set up to interface to Materials Management and Asset Management.

 

Set up Asset Management

1. Open Connect Asset Management > Organization.

2. Click to select Organization.

3. Click to select the Interfaces tab.

4. Click to select the Project Accounting subtab and then use the Interface menu to select Caselle 4.x.

5. Click Save (CTRL+S).

Asset Management is set up to interface to Project Accounting.

 

Set up Materials Management

1. Open Connect Asset Management > Organization.

2. Click to select Organization.

3. Click to select the Interfaces tab.

4. Click to select the Project Accounting subtab and then use the Interface menu to select Caselle 4.x.

5. Click Save (CTRL+S).

Materials Management is set up to interface to Project Accounting.

 

Set up Payroll

1. Open Connect Payroll > Organization.

2. Click to select Organization.

3. Click to select the Interfaces tab.

4. Click to select the Project Accounting subtab and then use the Interface menu to select Caselle 4.x.

5. Click Save (CTRL+S).

Payroll is set up to interface to Project Accounting.

 

Set up Timekeeping

1. Open Connect Payroll > Organization.

2. Click to select Organization.

3. Click to select the Interfaces tab.

4. Click to select the Project Accounting subtab and then use the Project Accounting Interface menu to select Caselle 4.x.

5. Click to select the Asset Management subtab and then use the Asset Management Interface menu to select Caselle 4.x.

6. Click Save (CTRL+S).

Timekeeping is set up to interface to Project Accounting.

 

 

Copyright © 2025 Caselle, Incorporated. All rights reserved.

    • Related Articles

    • Why can't I click on the Overheads link?

      If the Overheads link is not working, make sure the Project Accounting application is set up to use Asset Management and Materials Management. The Overheads link in Timekeeping will not work unless these options are selected in the Project Accounting ...
    • Overheads List

      Use the Overhead List to view the overhead code, description, activation/termination date, basis, rate/percent, minimum amount, maximum amount, credit GL account, GL debit overrides, and applied status to construction, maintenance, and cost of ...
    • Overheads Applied Report

      Use the Overheads Applied Report to view how equipment and labor overheads are applied. The report includes the job number, GL account, hours/dollars, amount/rate/percent, amount, and totals. Printing the Overheads Applied Report 1. Open Connect ...
    • How do I calculate a percentage based on multiple overheads?

      Use percent of overheads to charge a percentage of the amount allocated to overheads. Example: 5% of overheads. Overhead A + Overhead B + Overhead C = $200.00. The new overhead will calculate a percentage, like this 0.05 multiplied by $200.00 equals ...
    • What's the Amounts Not Updated link?

      If an account has unupdated actual amounts, an Amounts Not Updated link displays under the period with the unupdated amounts. If an account does not allow budget amounts, clicking the Amounts Not Updated link will search subsystems for unupdated ...